Note
Access to this page requires authorization. You can try signing in or changing directories.
Access to this page requires authorization. You can try changing directories.
The Work Center Load report shows the work load on a work center. The load on a work center is the sum of the required number of times that all the planned and actual orders are run on the work center in a specified period of time.
Use cases
Analyze the load on a work center.
Try the report
Try the report here: Work Center Load
Tip
If you hold down the CTRL key while you select the report link, the report opens on a new browser tab. In this way, you can stay on the current page while you explore the report on the other browser tab.