This article describes some of the Power BI visuals you can download, use, and modify from GitHub. These sample visuals illustrate how to handle common situations when developing with Power BI.

Slicers

A slicer narrows the portion of data shown in other visualizations in a report. Slicers are one of several ways to filter data in Power BI.

Screenshot shows Chiclet Slicer. Screenshot shows Timeline slicer.
Chiclet Slicer
Display image or text buttons that act as an in-canvas filter on other visuals
Timeline slicer
Graphical date range selector that filters by date
Screenshot shows Slicer sample.
Slicer sample
Demonstrates the use of the Advanced Filtering API

Charts

Get inspired with our gallery of Power BI visuals, including bar charts, pie charts, Word Cloud, and others.

Screenshot shows Aster Plot. Screenshot shows Bullet chart.
Aster Plot
A twist on a standard donut chart that uses a second value to drive sweep angle
Bullet chart
A bar chart with extra visual elements that provide context useful for tracking metrics
Screenshot shows Chord. Screenshot shows Dot plot.
Chord
A graphical method that displays the relationships between data in a matrix
Dot plot
Shows the distribution of frequencies in a great looking way
Screenshot shows Dual K P I. Screenshot shows Enhanced Scatter.
Dual KPI
Efficiently visualizes two measures over time, showing their trend on a joint timeline
Enhanced Scatter
Improvements on the existing scatter chart
Screenshot shows Force Graph. Screenshot shows Gantt.
Force Graph
Force layout diagram with curved path, which is useful to show connections between entities
Gantt
A bar chart that illustrates a project timeline or schedule with resources
Screenshot shows Table Heatmap. Screenshot shows Histogram chart.
Table Heatmap
Compare data easily and intuitively using colors in a table
Histogram chart
Visualizes the distribution of data over a continuous interval or certain time period
Screenshot shows LineDot chart. Screenshot shows Mekko chart.
LineDot chart
An animated line chart with animated dots that engage an audience with data
Mekko chart
A mix of 100% stacked column chart and 100% stacked bar chart combined into one view
Screenshot shows Multi K P I. Screenshot shows Power K P I.
Multi KPI
A powerful Multi KPI visualization with a key KPI along with multiple sparklines of supporting data
Power KPI
A powerful KPI Indicator with multi-line chart and labels for current date, value, and variances
Screenshot shows Power K P I Matrix. Screenshot shows Pulse chart.
Power KPI Matrix
Monitor balanced scorecards and unlimited number of metrics and KPIs in a compact, easy to read list
Pulse chart
This line chart annotated with key events is perfect for telling stories with data
Screenshot shows Radar chart. Screenshot shows Sankey chart.
Radar chart
Presents multiple measures plotted over a categorical axis, which is useful to compare attributes
Sankey chart
Flow diagram where the width of the series is proportional to the quantity of the flow
Screenshot shows Stream graph. Screenshot shows Sunburst chart.
Stream graph
A stacked area chart with smooth interpolation, which is often used to display values over time
Sunburst chart
Multilevel donut chart for visualizing hierarchical data
Screenshot shows Tornado chart. Screenshot shows Word Cloud.
Tornado chart
Compare the relative importance of variables between two groups
Word Cloud
Create a fun visual from frequent text in your data

WebGL

WebGL lets web content use an API based on OpenGL ES 2.0 to do 2D and 3D rendering in an HTML canvas.

Screenshot shows Globe Map.
Globe Map
Plot locations on an interactive 3D map

R visuals

These examples demonstrate how to harness the analytic and visual power of R visuals and R scripts.

Screenshot shows Association rules. Screenshot shows Clustering.
Association rules
Uncover relationships between seemingly unrelated data using if-then statements
Clustering
Find similarity groups in your data using k-means algorithm
Screenshot shows Clustering with outliers. Screenshot shows Correlation plot.
Clustering with outliers
Find similarity groups and outliers in your data
Correlation plot
Highlight the most correlated variables in a data table
Screenshot shows Decision tree chart. Screenshot shows Forecasting T B A T S.
Decision tree chart
Schematic tree-shaped diagram for determining statistical probability using recursive partitioning
Forecasting TBATS
Time-series forecasting for series that have multiple seasonalities using the TBATS model
Screenshot shows Forecasting with ARIMA. Screenshot shows Funnel plot.
Forecasting with ARIMA
Predict future values based on historical data using Autoregressive Integrated Moving Avg (ARIMA)
Funnel plot
Find outliers in your data using a funnel plot
Screenshot shows Outliers detection. Screenshot shows Spline chart.
Outliers detection
Find outliers in your data using the most appropriate method and plot
Spline chart
Visualize and understand noisy data
Screenshot shows Time Series decomposition chart. Screenshot shows Time series forecasting chart.
Time series decomposition chart
Understand the time series components using "Seasonal and Trend decomposition using Loess"
Time series forecasting chart
Using exponential smoothing model to predict future values based on previously observed values